January 2010

With the floor laid we sanded and applied OSMO Polyx oil to the floor.

Another shot of the completed floor.

After sanding cleanup.

 

After the oil was applied to the floor

 

 

June 2010

The plastered walls were coated in limeproof primer prior to finishing with Porters Limewash.

 

December 2010

Kitchen Cabinets are being installed, we decided to do the splashback in VJ boards painted with High gloss oil paint.

 

January 2011

Finally our kitchen is (almost) finished, some work still needed on the fireplace and some trims.

 

 

 

 